Hungerford Primary School

Our scope of works was to convert an existing courtyard into a new classroom within the school complex along with upgrades to the Fire Alarm and Data Installations.

There were further associated works involving alterations to classrooms and enlarging the toilet facilities and truss strengthening works where the requirement for the work was discovered late in the project. All works had to be accessed through a single doorway due to the live school environment except for the steel and concrete slab which were lifted and pumped over respectively.

Download the Case Study